The permission to commission the facility confirms that the parameters of the constructed, reconstructed capital object comply with the standard values, project documentation, including the requirements of energy efficiency and the requirements for equipping the capital object with metering devices for energy resources use.
Work stages
Construction of buildings and structures (from the construction section)
Complex of works on construction
Laboratory tests
Handing over laboratory and instrumental tests
Documentation
Collecting all necessary documents and forms
Commissioning
We put the object into operation after the completion of construction
Laboratory-instrumental tests:
Radiation survey of a land plot (gamma-ray survey of the territory and radon EEVA measurement);
Layer-by-layer chemical, bacteriological, parasitological analysis of the soil, as well as toxicological examination of the soil, determination of the soil hazard class;
Concrete Strength Laboratory Tests
Seam Welding Laboratory Tests
Vibration measurement;
Measurement of electromagnetic fields with power frequency 50 Hz
Based on the test results, you will receive:
Technical report on laboratory and instrumental studies;